Faktor Dominan Keterlambatan pada Proyek Konstruksi Gedung Bertingkat di Surabaya dengan Metode Relative Importance Index (RII)
DOI:
https://doi.org/10.61132/prosemnasproit.v2i2.50Keywords:
Building Construction, Factor, Project Delay, RII, SurabayaAbstract
Delays in high-rise building construction projects in Surabaya are a crucial issue as they can significantly affect cost, quality, and project completion schedules. This reserach intends to identify the dominant factors contributing to project delays using the Relative Importance Index (RII) method, considering both frequency and impact aspects. Data were obtained from 80 valid respondents who hold strategic roles in construction project implementation, such as Project Managers, Site Managers, Site Engineers, Estimators, Field Supervisors, General Managers, and Company Directors. The analysis results indicate that in terms of frequency, the dominant factors are unfavorable weather conditions (RII = 0.750), labor shortages (RII = 0.743), and design changes during construction (RII = 0.735). Meanwhile, in terms of impact, the dominant factors are delays in material delivery (RII = 0.780), labor shortages (RII = 0.770), and substandard material quality (RII = 0.740). These findings emphasize that labor shortage consistently influences project delays in both frequency and impact, while weather and material factors show different patterns between occurrence and consequence. All dominant factors were classified into the High-Medium category, indicating that they should be prioritized in project risk management.
References
Aarthipriya, V., Chitra, G., & Poomozhi, J. S. (2020). Risk and its impacts on time and cost in construction projects. Journal of Project Management (Canada), 5(4). https://doi.org/10.5267/j.jpm.2020.6.002
Abdelrehim, S. M., Nessim, A. A., & Othman, A. A. E. (2022). Achieving sustainability through reducing risks during architecture design process: A lean management perspective. IOP Conference Series: Earth and Environmental Science, 1056(1). https://doi.org/10.1088/1755-1315/1056/1/012002
Ahmad, A., Ahmed, A., Siyaka, S. O., Yaro, N. S. A., Musa, M. M., & Aliyu, B. U. (2023). Analyzing cost risk indicators for enhancing construction project delivery performance. UNIOSUN Journal of Engineering and Environmental Sciences, 5(2). https://doi.org/10.36108/ujees/3202.50.0250
Ahmad, S. (2019). Causes of delay in highway construction projects using relative importance index method. International Journal for Research in Applied Science and Engineering Technology, 7(7). https://doi.org/10.22214/ijraset.2019.7176
Ajayi, B. O., & Chinda, T. (2022). Impact of construction delay-controlling parameters on project schedule: DEMATEL-system dynamics modeling approach. Frontiers in Built Environment, 8. https://doi.org/10.3389/fbuil.2022.799314
Alshihri, S., Al‐gahtani, K., & Almohsen, A. (2022). Risk factors that lead to time and cost overruns of building projects in Saudi Arabia. Buildings, 12(7). https://doi.org/10.3390/buildings12070902
Bayraktar, O. Y. (2020). Risk management in construction sector. World Journal of Advanced Research and Reviews, 8(2). https://doi.org/10.30574/wjarr.2020.8.2.0433
Calik, I., Koc, K., & Şahin, O. (2025). Life cycle risk management for improving labor productivity in construction projects in Türkiye. Buildings, 15(3). https://doi.org/10.3390/buildings15030484
Dixit, S., Sharma, K., & Singh, S. (2020). Identifying and analysing key factors associated with risks in construction projects. In Lecture Notes in Civil Engineering (Vol. 61). https://doi.org/10.1007/978-981-15-1404-3_3
Ekung, S., Lashinde, A., & Adu, E. (2021). Critical risks to construction cost estimation. Journal of Engineering, Project, and Production Management, 11(1). https://doi.org/10.2478/jeppm-2021-0003
Fadilah, S. N. (2017). Analisis risiko keterlambatan pelaksanaan konstruksi proyek Kampus II UIN Sunan Ampel Kota Surabaya menggunakan metode Analytic Network Process (ANP).
Gunduz, M., & Abu-Hijleh, A. (2020). Assessment of human productivity drivers for construction labor through importance rating and risk mapping. Sustainability (Switzerland), 12(20). https://doi.org/10.3390/su12208614
Hamouda, A. A. H. (2020). External factors of delay that affect the performance of international construction contractors in Kuwait. International Journal of Integrated Engineering, 12(8). https://doi.org/10.30880/ijie.2020.12.08.002
Husin, S., Mubarak, M., & Fachrurrazi, F. (2019). The significance risk for factors of labour, material, and equipment on construction project quality. Aceh International Journal of Science and Technology, 8(2). https://doi.org/10.13170/aijst.8.2.13281
Jayady, A., & Supratman, R. (2022). Project delay prediction with earned value method: A case on the CSS-Apartment project in Surabaya-Indonesia. Indonesian Journal of Multidisciplinary Science, 1(8). https://doi.org/10.55324/ijoms.v1i8.154
Kaur, M., & Singh, R. (2018). Risk and risk-handling strategies in construction projects. International Journal of Management Studies, 5(1), 1–9. https://doi.org/10.18843/ijms/v5i1(4)/01
Khairani, F., & Supriyadi, I. (2021). Analisis faktor keterlambatan pada pembangunan proyek X. Journal of Applied Civil Engineering and Infrastructure Technology, 2(2). https://doi.org/10.52158/jaceit.v2i2.248
Makukha, R. S. (2024). Risk management in the construction industry in Ukraine. Problems of Theory and Methodology of Accounting, Control and Analysis, 2(58), 39–44. https://doi.org/10.26642/pbo-2024-2(58)-39-44
Malunjkar, H., & Aher, M. (2023). Delay analysis of road construction projects using RII method. International Journal for Research in Applied Science and Engineering Technology, 11(5). https://doi.org/10.22214/ijraset.2023.52668
Megawati, L. A., & Lirawati. (2021). Analisis faktor keterlambatan proyek konstruksi bangunan gedung.
Musonda Musakanya, M. (2020). Construction cost estimates related risks. International Journal of Sciences, 9(01). https://doi.org/10.18483/ijsci.2240
Negi, A. (2021). Risk assessment and management in construction projects. Mathematical Statistician and Engineering Applications, 70(1). https://doi.org/10.17762/msea.v70i1.2522
Nguyen, P. T. (2020). Attitude of construction workers toward labour safety. International Journal of Business Continuity and Risk Management, 10(2–3). https://doi.org/10.1504/IJBCRM.2020.108507
Oyieyo, P. A., Rambo, C., & Ndiritu, A. (2020). Financial effect of labour related risks on completion of PPP projects. Advances in Social Sciences Research Journal, 7(10). https://doi.org/10.14738/assrj.710.9191
Pham, C. P., Nguyen, P. T., Phan, P. T., Nguyen, Q. L. H. T. T., Le, L. P., & Duong, M. T. H. (2020). Risk factors affecting equipment management in construction firms. Journal of Asian Finance, Economics and Business, 7(11). https://doi.org/10.13106/jafeb.2020.vol7.no11.347
Polat, G., Turkoglu, H., & Gurgun, A. P. (2017). Identification of material-related risks in green buildings. Procedia Engineering, 196. https://doi.org/10.1016/j.proeng.2017.08.036
Putra Agritama, R., Huda, M., Setiyo Rini, T., Program Studi Teknik Sipil, M., Teknik, F., Jurusan Teknik Sipil, D., & Wijaya Kusuma Surabaya ABSTRAK, U. (2018). Faktor-faktor yang mempengaruhi keterlambatan proyek konstruksi di Surabaya. Vol. 6(1).
Puzyrev, A. M., & Kozyreva, L. V. (2022). Development of a methodology for assessing professional risks in construction. Safety of Technogenic and Natural System, 1. https://doi.org/10.23947/2541-9129-2022-1-9-17
Saeed, Y. S. (2018). Cost and time risk management in construction projects. Tikrit Journal of Engineering Sciences, 25(1). https://doi.org/10.25130/tjes.25.1.07
Serogina, D., Puskhar, T., & Zhovtiak, H. (2022). The impact of the construction industry on the social and economic development of territories. Scientific Bulletin of the National Academy of Statistics, Accounting and Audit, 1–2. https://doi.org/10.31767/nasoa.1-2-2021.08
Sharma, M. (2018). Risk analysis in construction projects. International Journal for Research in Applied Science and Engineering Technology, 6(3). https://doi.org/10.22214/ijraset.2018.3591
Siman, B. P. (2023). A critical analysis of the Philippine construction industry: Current trends, forecast, and business focus for engineering design firms. International Journal of Multidisciplinary: Applied Business and Education Research, 4(8). https://doi.org/10.11594/ijmaber.04.08.01
Srinivasan, N. P., Dinesh, A., Munshi, S., & Karthick, A. (2022). Factors influencing financial risk management in construction projects. IOP Conference Series: Earth and Environmental Science, 1125(1). https://doi.org/10.1088/1755-1315/1125/1/012025
Tang, H., Wang, G., Miao, Y., & Zhang, P. (2020). Managing cost-based risks in construction supply chains: A stakeholder-based dynamic social network perspective. Complexity, 2020. https://doi.org/10.1155/2020/8545839
Zhao, X. (2024). Construction risk management research: Intellectual structure and emerging themes. International Journal of Construction Management, 24(5). https://doi.org/10.1080/15623599.2023.2167303
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 Prosiding Seminar Nasional Ilmu Teknik

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.